Charger rebates and support for multi-unit residential buildings
Make charging an electric vehicle (EV) easier for yourself or building residents. Get rebates and support to plan for and install EV chargers at your multi-unit residential building (MURB).

Eligibility details
Who can apply:
- Building owner
- Authorized representative
- Unit owner
- Renter
The building must be:
- Located in B.C.
- An apartment, condo or townhouse with 5 or more units per complex
- The occupant’s primary residence
- Constructed on or before August 31, 2022
- Not used for short term rentals, like hotels
Renters and unit owners living in single-family homes can apply for a home charger rebate.
Costs incurred before approval are not eligible for reimbursement.
See the program guide for full eligibility requirements.
How it works
How it works diagram showing five circles connected by a flowing arrow. They indicate the five phases of the rebate process: Read the program guide, Contact an EV advisor (optional), Get pre-approved, Complete projects within allowed timeframe , and Apply for rebate(s).
Read the program guide
Contact an EV advisor (optional)
Get pre-approved
Complete projects within allowed timeframe
Submit documents and get rebate(s)
Rebate options and amounts
EV Ready rebates for building owners and authorized representatives
EV Ready plan rebate:
- Get back 75 percent of eligible costs
- Support to create a building-wide plan to make parking spaces ready for EV chargers
- Maximum of one EV Ready plan per MURB
EV Ready infrastructure rebate:
- Get back 50 percent of eligible costs
- Supports implementing your EV Ready plan
- Indigenous-owned MURBS can get back 75 percent of eligible costs
MURB charger rebate:
- Get back 50 percent of eligible costs
- For MURBs that got the EV Ready infrastructure rebate
| Item | Maximum rebate amount | Max. rebate for Indigenous-owned MURBs | Rebate cap |
|---|---|---|---|
| EV Ready plan | $3,000 per MURB | $3,000 per MURB | $3,000 per MURB |
| EV Ready infrastructure | $600 per parking space | $600 per parking space | $120,000 per MURB |
| MURB charger rebate | $1,400 per charging station | $3,900 per charging station | $14,000 per MURB |
Combined maximum EV Ready rebate amount: $137,000 per MURB
Standalone MURB charger rebates
- Get back 50 percent of eligible costs
- Indigenous-owned MURBs or Indigenous individuals living in MURBs can get back 75 percent of eligible costs
- Charger rebates for MURB owners and representatives are capped annually at $14,000
| Level 2 charger | Maximum rebate amount | Max. rebate for Indigenous-owned MURBS |
|---|---|---|
| Single port station | $2,000 | $4,500 |
| Dual port station | $4,000 | $9,000 |
Unit owners and renters
You are limited to one rebate over the program’s lifetime.
Your building owner or representative can submit a combined rebate application if a group of residents would like to apply. Combined applications are linked to the building address and fall into the MURBs annual rebate limit.
Before you apply
Ready to apply?
Learn more and apply for rebates with your electricity provider:



